PCC Public Advisory

 

System Maintenance Advisory: MAO E-Notification System

Please be advised that the MAO E-Notification System will undergo scheduled maintenance to implement system enhancements from 01 April to 06 April 2026. During this period, the system will be temporarily unavailable.

The last day for electronic submissions through the MAO E-Notification System will be on 31 March 2026 (5:00 PM).

If there are submissions due during the scheduled maintenance period, all concerned parties are advised to ensure the early submission of the necessary documents prior to the maintenance dates.

The enhanced MAO E-Notification System will resume normal operations on Tuesday, 07 April 2026.

For any questions or concerns, please contact the Mergers and Acquisitions Office via email at mergers@phcc.gov.ph or by telephone at +632 8771 9722 local 252.

Please be guided accordingly.

 

 

 

Advisory: LMS Rebranding to PCC eCLASS

In line with its rebranding efforts, PCC's Learning Management System (LMS), previously known as iCLP: Online Learning Hub on Competition Law and Policy, will now be called PCC eCLASS: Enhanced Competition Learning Activities Spaces.

Correspondingly, the platform’s domain name will be changed from iclp.phcc.gov.ph to eclass.phcc.gov.ph.

Please be advised that the LMS will be temporarily unavailable from March 27, 2026 (5:00 PM) to March 31, 2026 (11:59 PM) to facilitate this transition.

Beginning April 1, 2026, users may access PCC’s online courses through the new domain.

 

 

 

PCC Advisory: Trunkline Service Interruption

 

/ Commission Decision No. 27-M-025/2018: Acquisition by Citicore Renewable Energy Corporation of Shares in Enfinity Philippines Renewable Resources Inc.

Commission Decision No. 27-M-025/2018:
Acquisition by Citicore Renewable Energy Corporation of Shares
in Enfinity Philippines Renewable Resources Inc.

ABSTRACT:

The transaction involves the acquisition by Citicore Renewable Energy Corporation (CREC) of the entire issued and outstanding capital stock of Enfinity Philippines Renewable Resources Inc., (EPRRI) from Lumos Investment Pte. Ltd. and Mabalacat Solar Inc.

CREC is a wholly-owned subsidiary of Citicore Power Inc. (CPI), which is in turn a wholly-owned subsidiary of Citicore Holdings Investment, Inc. (CHII). Its affiliate companies are Megawide Construction Corporation, primarily engaged in construction, and also MySpace Properties, Inc., a property holding of CHII.

CPI is a renewable energy company committed to helping achieve a healthy energy mix for the country and lessen the nationwide dependence on fossil fuels through projects using clean and sustainable energy. It aims to be one of Southeast Asia’s leading producers of renewable energy.

CPI currently owns and operates three (3) solar plants: (i) Mariveles, Bataan (18 Megawatts); (ii) Silay, Negros Occidental (25 MW); and (iii) Toledo, Cebu (60 MW). In total, CPI and its subsidiaries owns, operates and maintains a 103.0 MW portfolio of solar power plants in the Philippines.

EPRRI operates a solar power plant in Clark, Pampanga with a capacity of 22.33 MW (DC). Lumos Investment Pte. Ltd. and Mabalacat Solar Philippines, Inc. currently own 39.91% and 60.09%, respectively, of the capital stock of EPRRI.

With the acquisition, CPI’s total renewable energy capacity will increase from 103.0 Megawatt peak to 125.3 Megawatt peak, comprising less than 1.77% of the renewable energy industry’s installed generating capacity and 14.16% of the solar energy generating capacity as of 2017.

1678154218_Commission-Decision-No.-27-M-025-2018-20180814_Citicore-Enfinity.pdf