PCC Public Advisory

 

System Maintenance Advisory: MAO E-Notification System

Please be advised that the MAO E-Notification System will undergo scheduled maintenance to implement system enhancements from 01 April to 06 April 2026. During this period, the system will be temporarily unavailable.

The last day for electronic submissions through the MAO E-Notification System will be on 31 March 2026 (5:00 PM).

If there are submissions due during the scheduled maintenance period, all concerned parties are advised to ensure the early submission of the necessary documents prior to the maintenance dates.

The enhanced MAO E-Notification System will resume normal operations on Tuesday, 07 April 2026.

For any questions or concerns, please contact the Mergers and Acquisitions Office via email at mergers@phcc.gov.ph or by telephone at +632 8771 9722 local 252.

Please be guided accordingly.

 

 

 

Advisory: LMS Rebranding to PCC eCLASS

In line with its rebranding efforts, PCC's Learning Management System (LMS), previously known as iCLP: Online Learning Hub on Competition Law and Policy, will now be called PCC eCLASS: Enhanced Competition Learning Activities Spaces.

Correspondingly, the platform’s domain name will be changed from iclp.phcc.gov.ph to eclass.phcc.gov.ph.

Please be advised that the LMS will be temporarily unavailable from March 27, 2026 (5:00 PM) to March 31, 2026 (11:59 PM) to facilitate this transition.

Beginning April 1, 2026, users may access PCC’s online courses through the new domain.

 

 

 

PCC Advisory: Trunkline Service Interruption

 

/ Commission Decision No. 41-M-049/2017 Joint Venture between Prime Metro Power Holdings Corporation and San Lorenzo Ruiz Builders & Developers Group, Inc. (Wawa JVCo)

Commission Decision No. 41-M-049/2017
Joint Venture between Prime Metro Power Holdings Corporation
and San Lorenzo Ruiz Builders & Developers Group, Inc. (Wawa JVCo)

 

ABSTRACT:

The proposed transaction is a joint venture between San Lorenzo Ruiz Builders & Developers Group, Inc. (SLRBDGI) and Prime Metro Power Holdings Corporation (PMPHC) to form the “Wawa JVCo.” The Wawa JVCo will construct and establish facilities to capture and divert water for municipal use from the Wawa River to provide either raw or treated water to water distributors and consumers in Metro Manila and surrounding communities (the Wawa Water Project).

SLRBDGI is the holder of the Water Permit for 3,480 liters per second of water from the Wawa River for municipal/commercial use (the “Wawa Water Permit”). It also has a pending application with the National Water Resources Board to increase the volume of water under the Wawa Water Permit from 3.48 cubic meters per second (CMS) to at least 18.13 CMS, and up to 40 CMS (the “Application for Volume Increase”).

SLRBDGI will contribute the Wawa Water Permit, Application for Volume Increase, and the Wawa Water Project to the Wawa JVCo, in exchange for 18 percent of ownership of the Wawa JVCo.

PMPHC proposes to invest in and assume controlling stake in the in the Wawa JVCo, with 82 percent share ownership thereof, after the Wawa Water Permit, Application for Volume Increase, and the Wawa Water Project are transferred to the Wawa JVCo. PMPHC undertakes to raise project funding for the Wawa Water Project once it is convinced of the legal, commercial and financial viability of the Wawa Water Project after it conducts due diligence within a period of one year.

1678156182_Commission-Decision-No.-41-M-049-2017_Prime-Metro-Power-San-Lorenzo-Ruiz-Piat2-1.pdf

Back